Skip to content

Download data

Synchronize your computer and tablet/smartphone

  1. Start NuScribe and select project.

  2. Synchronize the NuSite app (cf. Prepare your survey). Deployments with associated Line/Station assignments should now appear in View -> Deployments.

Download data

  1. In Data Panels -> Rack, select Upload sequence, then Edit Sequence to check output directory in Seismic

    Warning

    Make sure Output raw file is not checked.

  2. Insert the first 8 nodes in the DMP rack

  3. Launch the sequence with the green arrow. Nodes will turn yellow, then display Serial Number, and finally turn green once data download is over.

    Info

    You can live check the sequence status by opening DMP Sequence panel, then right clicking on a blue cup on the rack panel and selecting Display Command Sequence.

  4. Repeat steps 2 and 3 until all nodes data have been downloaded.